Recommended
8-Day Lemosho
The full route, with a night at Shira 1 and a night at Karanga Camp.
- The best acclimatisation on Kilimanjaro
- Strongest chance of reaching the summit
- Gentle daily stages
- Ideal for first-time climbers
03°01′S 37°13′E Shira Plateau · 07:00
The Quiet Western Route
On the mountain 8 days Best for acclimatisation
Plan My Lemosho Climb5-Star Rated · 20+ Years on Kilimanjaro · Experienced Mountain Crews
What is the Lemosho Route?
The Lemosho Route climbs Kilimanjaro from the quiet west side. It starts in remote rainforest near Londorossi Gate, crosses the wide Shira Plateau, joins the southern circuit at Lava Tower and Barranco, and reaches Uhuru Peak (5,895 m) from Barafu Camp before descending by the Mweka Route. It takes 7 or 8 days, covers about 70 km and is fully camped. With more days and a gradual climb, it is widely seen as the route with the best summit chances and some of the finest scenery on the mountain.
Why Lemosho
The first days are yours alone. While other routes start busy, Lemosho begins in untouched western rainforest, with few other climbers and the sound of colobus monkeys above.
Then the mountain opens up. You walk across the Shira Plateau, one of the highest plateaus on Earth, with Kibo growing bigger every day. The pace is slow and steady, so your body has time to adjust.
That is the real benefit: more days at altitude, more comfort and a stronger chance of standing on Uhuru Peak. If you can give the mountain eight days, this is the route we recommend.
Lemosho Route
A quiet forest start. A plateau under the sky. The best way to give yourself the summit.
At a glance
| Duration | 7 or 8 days on the mountain (8 recommended) |
|---|---|
| Distance | About 70 km |
| Start | Lemosho trailhead, about 2,100 m, after registering at Londorossi Gate |
| Summit | Uhuru Peak, 5,895 m |
| Descent | Mweka Route to Mweka Gate, about 1,640 m |
| Accommodation | Tents (no huts) |
| Difficulty | Challenging but not technical; one easy scramble at the Barranco Wall |
| Crowds | Quiet for the first days, then joins the Machame trail |
| Best time | January to mid-March and June to October |
Choose your days
Recommended
The full route, with a night at Shira 1 and a night at Karanga Camp.
One day shorter
Skips Karanga and goes from Barranco straight to Barafu.
Both include a hotel night in Moshi or Arusha before and after the climb.
Day by day
Day 0
Airport pickup, rest, and a briefing with your lead guide. We check your gear and answer every question.
Day 1
Drive to the western side, register at Londorossi Gate, then walk through quiet, ancient rainforest to your first camp.
Day 2
Leave the forest, climb onto the Shira Ridge and see Kibo across the plateau for the first time.
Day 3
An easy, wide walk across the Shira Plateau, with an optional detour to the Shira Cathedral viewpoint.
Day 4
The key acclimatisation day. Climb high to Lava Tower, then descend to sleep lower in the Barranco Valley among giant groundsels.
Day 5
Scramble up the Barranco Wall, using your hands in places, then an easy walk to Karanga for another night to adjust.
Day 6
A short climb to high camp. Early dinner, rest and a final briefing before the summit night.
Day 7
Start around midnight. Reach Stella Point at the crater rim for sunrise, then Uhuru Peak, the highest point in Africa. Descend to Mweka Camp to rest.
Day 8
A gentle walk down through the forest. Collect your summit certificate, say goodbye to your crew and return to your hotel.
7-day version: Day 5 goes from Barranco Camp over the Barranco Wall and straight to Barafu Camp (about 9 km, 7–8 h); the summit is on Day 6. Distances and times are approximate and depend on pace and weather.
Your climb with Yera
Your exact inclusions are confirmed in writing in your proposal.
Compare routes
| Lemosho | Machame | Marangu | |
|---|---|---|---|
| Days | 7–8 | 6–7 | 5–6 |
| Start | Quiet west side | Busy south side | South-east, busy |
| Scenery | Excellent, includes the Shira Plateau | Excellent and varied | Good, same path up and down |
| Acclimatisation | Best | Good | Weaker |
| Sleeping | Tents | Tents | Huts |
| Best for | Best summit chances, quiet start | Most first-time climbers on fewer days | Hut comfort, shorter trips |
When to climb
Dry and clear, cold at night. The most popular season.
Warmer, often clear, with fewer climbers than August.
Rainy seasons. The western forest gets very muddy. We advise against April and May.
Our promise
We match the route and days to your fitness, not just your budget.
Daily health checks and a crew trained to turn back when it matters.
Your proposal is free, and every inclusion is stated before you pay.
Questions climbers ask
About 70 km over 7 or 8 days on the mountain. The 8-day version is recommended for the best acclimatisation.
For most climbers, yes. Its quiet start, gradual climb and extra days give some of the best summit chances and scenery on the mountain.
Challenging but not technical. The hardest parts are the Barranco Wall scramble and the long summit night. The gentle early days make it easier than shorter routes.
Lemosho starts on the quieter west side, crosses the Shira Plateau and takes a day longer, so acclimatisation is better. Machame is shorter and busier from the start. They share the same trail from Lava Tower to the summit.
Yes. With 8 days and good preparation, it is one of the best choices for first-time climbers. No climbing experience is needed.
January to mid-March and June to October, the driest months. Avoid April and May, when the western forest is very wet.
On the west side of Kilimanjaro. You register at Londorossi Gate, then drive to the Lemosho trailhead, about 2,100 m, to begin walking.
Begin your climb
Tell us your dates and fitness. A private climb proposal reaches you within 24 hours.
Ready When You Are
Tell us your dates and interests — we'll shape a private itinerary suited to you, from the first game drive to the last sundowner.
Request a Quote